Skip to main content
Industry · Construction

IT support for Brisbane construction firms — site to office, drawings included

Managed IT for builders, subcontractors and civil contractors. Site connectivity that works from a demountable, drawings that stay current, and a head office that does not become the bottleneck.

16+ years

Brisbane-based since 2010

1,500+

Employees supported across SEQ

Named engineers

The same team every time

Essential Eight aligned

Microsoft Partner

What we hear from construction

The IT problems specific to your sector

Sites with no infrastructure

A new site has power if you are lucky and no network at all. Site offices need connectivity from day one, in locations with variable mobile coverage and no fixed service available.

Drawings out of date on site

The most expensive IT failure in construction is someone building from a superseded revision. That is a document control problem, and it becomes a rework invoice.

Staff who are never at a desk

Site supervisors, project managers and estimators work from utes, sites and home. Anything requiring them to be in the office to access a file does not get used.

Rugged reality

Dust, heat, vibration and drops. Standard office hardware in a site office has a much shorter life, and specifying it as though it will sit on a desk is a recurring cost.

Subcontractors needing access

Subbies and consultants need current drawings and documents without being given open access to everything the business holds.

Estimating and tender deadlines

Tender close is a hard deadline. An outage during a submission window has a direct and measurable cost.

The office is not where the work happens

Construction is one of the few industries where most of the workforce is never at a desk, and where the physical environment is actively hostile to equipment. IT built around a head office and extended reluctantly to site tends to be worked around rather than used.

The practical test is whether a site supervisor with dusty hands, standing in a demountable with patchy coverage, can open the current drawing on the first attempt. If not, they will use the printed copy in the ute, and the printed copy is a revision behind.

Site connectivity

New sites do not have fixed internet, and getting one provisioned usually takes longer than the early stage of the project.

Mobile broadband with an external antenna is the standard answer, and the variable worth checking is coverage — it differs meaningfully across South-East Queensland, and finding out on mobilisation day is the wrong time. We check before the site opens.

For longer projects and poorer coverage there are better options at higher cost, and that becomes a project budget decision rather than an IT one.

Document control is the expensive one

The most costly IT failure in construction is not an outage. It is someone building from a superseded revision, and the invoice arrives as rework.

That is a document control problem, and it is caused by distribution: drawings emailed as attachments, saved to devices, printed and pinned up. Every one of those copies is frozen at the moment it was made.

The fix is a single source that people access rather than copy — Procore, Aconex or a well-structured SharePoint library with real revision control. The technology matters less than the behaviour, and the behaviour only changes if opening the current document is genuinely easier than using the old one.

Hardware specified for the conditions

Site offices destroy standard office equipment faster than anyone budgets for. Dust, heat, vibration and being dropped are ordinary conditions rather than accidents.

Over a three-year view, rugged hardware for genuinely field-based staff usually costs less than replacing standard machines repeatedly, plus the downtime while a supervisor waits for a replacement. For staff who are mostly in a vehicle and occasionally on site, standard business-grade equipment is often the right call. It is worth specifying honestly rather than applying one standard across the business.

Head contractors are asking about security

On government and tier-one work, supply chain security questionnaires have become routine. Questions about MFA, backup, patching and incident response, with prequalification attached to the answers.

An Essential Eight assessment is generally the proportionate response — it produces documented evidence you can hand over, and the underlying control work is worth doing regardless.

Construction IT support FAQs

How do you get internet to a new site office?

Usually 4G or 5G mobile broadband with an external antenna, because a fixed service either is not available or takes months to provision. Site selection matters — coverage varies significantly across South-East Queensland and a check before mobilisation avoids discovering a problem on day one. Where a site will run for a long time and coverage is poor, other options exist but cost more. The practical answer is that we assess coverage before the site opens rather than after.

How do we stop people building from old drawings?

Single source of truth, accessed rather than distributed. The failure is emailed PDFs and files copied to individual devices, because those copies never update. Platforms like Procore and Aconex exist for exactly this, and where a business is not using one, a properly structured SharePoint library with clear revision control is workable. The critical behavioural change is that site staff open the current document rather than the one they saved last month.

Is it worth buying rugged laptops for site?

For staff who are genuinely in the field daily, usually yes over a three-year view. Standard business laptops in a site office fail considerably faster, and the replacement cost plus the downtime generally exceeds the premium. For a project manager who is mostly in a vehicle and occasionally on site, a standard business-grade machine with a decent case is often sufficient. It comes down to honest assessment of where the device actually spends its time.

How do we give subcontractors access without giving them everything?

Guest access to specific project areas, with expiry. Whether that is in your project management platform or in a SharePoint site depends on your stack, but the principle is the same: access scoped to the project and reviewed, not a shared login circulated by email. The common failure is that a subcontractor from a project finished two years ago still has access to a live area.

Do head contractors ask about our cyber security?

Increasingly, yes, particularly on government and tier-one projects. Supply chain security questionnaires now regularly ask about MFA, backups, patching and incident response, and being unable to answer can cost a prequalification. An Essential Eight assessment is usually the proportionate way to get evidence you can hand over.

Ready to talk?

A 30-minute consultation with an engineer, not a salesperson. You'll get an honest read on whether we're a fit.

Call Get a quote